Noise Surveys for Construction Crews

On a construction site the noise changes with the task, the trade and the day. We measure exposure by task so your program reflects the work your crews actually do, rather than a single reading from one afternoon.

Noise measurement on site by Clear Work in construction
Registered Nurses
Certified Industrial Audiometric Technicians
Occupational Health Compliance Programs
Fully Licensed & Insured
BBB Accredited
100+ BC Employers Served
Why Noise Measurement Is Harder on Site

No Fixed Workstation Means No Single Answer

A plant operator stands in one place; a carpenter does not. Exposure on a construction site is driven by which tasks a worker performs and for how long, and that shifts as the build progresses. Typical construction noise sources include:

  • Concrete saws, grinders and chipping hammers
  • Pneumatic breakers and jackhammers
  • Nail guns and powder-actuated tools
  • Generators, compressors and compactors
  • Heavy equipment and haul traffic

Section 7.2 sets two exposure limits, and an employer must ensure workers are not exposed above either one: an 85 dBA Lex daily noise exposure level, and a 140 dBC peak sound level. The first is an average across the working day; the second is a single loud event, measured at its peak.

Under section 7.3(1), an employer must measure worker noise exposure where a worker is or may be exposed to potentially harmful levels of noise, or where information indicates exposure may exceed 82 dBA Lex. That sits below the 85 dBA Lex limit — the duty to measure starts before you are over the line.

There is an alternative, and we would rather tell you about it than not. Section 7.4 removes the duty to measure where the employer, based on other information, identifies the worker as being exposed in excess of an exposure limit and establishes an effective noise control and hearing conservation program for that worker. Note what that costs: it is an evidence-based identification rather than a free election, and the program it commits you to includes engineered noise control, not just hearing tests and earplugs. Measuring is worth it when you want to know who is genuinely below the limits, size hearing protection to the actual level, or show an officer real numbers instead of an assumption.

One limitation we would rather state up front: full-shift dosimetry establishes daily exposure against the 85 dBA Lex limit. Impact noise measured against the 140 dBC peak limit is a separate question, and we will tell you which of the two a given survey addresses.

For the wider picture, we set out the WorkSafeBC hearing testing and noise requirements in full, straight from the regulation.

Noise dosimeter fitted to a worker in construction
What's Included

What a Construction Noise Survey Gives You

Full-shift personal dosimetry and area readings, using methods based on CSA Standard Z107.56, with calibration recorded and results documented for your program file.

Full-Shift Dosimetry

Personal noise dosimeters worn across a real working shift, so the numbers reflect the job as it is actually done.

Area Mapping

Sound level meter readings across the site, so you can decide where hearing protection is needed and where signs should go if section 7.7 applies to you.

Documented Results

Measured levels, the sampling method, and field calibration records. Section 7.9(c) requires you to keep the results of noise measurements taken under 7.3 — we give you those results in a form you can keep.

Why Partner With Us

Why BC Construction Employers Choose Clear Health Group

We already deliver on-site hearing testing to construction employers across the Lower Mainland and Fraser Valley. Noise measurement is part of the wider workplace noise survey service we run across the Lower Mainland and Fraser Valley.

Task-Based Sampling

We sample representative tasks rather than assuming a static workstation, so the report holds up when the site changes next month and the trades rotate through.

Measurement That Travels

Construction work moves, so we sample around tasks and equipment rather than one location. Worth knowing up front: section 7.3(2)(b) requires measurement to be updated if a change in equipment or process affects the noise level or how long workers are exposed. On construction that happens often, so we will tell you what would trigger a re-measure rather than implying one survey covers you indefinitely.

Clear Work mobile occupational health van parked at a worksite
5.0
*
Average Rating
100
+
BC Employers, All Services
82
dBA Lex
One Trigger For The Duty To Measure
Where We Work

Provincial Coverage. Local Service.

Clear Health Group delivers mobile occupational health and RN-led home services across British Columbia - including the Lower Mainland, Fraser Valley, Vancouver Island, and the BC Interior. Our team travels directly to worksites and homes, eliminating the need for clinic visits.

Currently serving major BC municipalities including:

What Employers Across BC Say About Us

Clear Health Group supports employers with reliable, structured mobile health services designed to simplify compliance and reduce operational disruption. Families trust our RN-led team for professional in-home care delivered with consistency and clinical oversight.

We recently used Clear Health Group for our company-wide annual hearing testing and respirator fit testing across two locations and two days. … Seamless and professional.

Verified Google Review

They showed up to our jobsite in Duncan, on time and were well prepared for our team to have their fit tests done on site.

Verified Google Review

Wonderful experience! Noah was lovely to coordinate with and the testing experience was seamless for our team! Would happily book again for our next test. Cheers!

Bodhin Kidd

We got our mask fitting tests done by Amy. Both the service and attitude were excellent! Will definitely call them again for other services!

Fa R-O

Great experience with Noah and Catherine. Showing up on time, very professional and on track for the schedule.

Fady Moussa

Definitely good at their job. Noah and Amy were at our construction job site and did a good job for testing. Helped all our crew on site.

Tanveer Singh

Happy to have booked with Clear Work. Noah & Nina were fast, easy to work with, and readily available. 5/5!

Jason Mitchell

ClearHealth is fantastic. Very accommodating and Noah is an absolute pleasure. Very friendly, quick services, very efficient! Highly recommend.

Brenda Cox

Friendly, professional and accommodating team! Pleasure to work with.

Danny Desousa

A great on-site hearing test experience. Katherine was kind, professional, and made the process quick and comfortable.

Vijay Kethan

Overall it was a wonderful experience for the test. Very professional and good consultation regarding hearing loss prevention.

Lovepreet Singh

Ammy took my hearing test and it was an awesome experience. She was very professional, kind, and explained everything clearly. The test was done smoothly and I felt comfortable the entire time. I truly appreciate her patience and excellent service. Highly recommended!

Bipanpreet Singh

Frequently Asked Questions

Common questions from BC construction employers about noise measurement.

How do you survey noise on a site where the work changes every day?
arrow_forward_ios

By measuring tasks rather than places. We identify the activities that drive exposure, sample workers performing them over a full shift, and record the equipment and duration alongside the levels. That produces exposure data tied to the work itself rather than to one site on one day. It is not permanent: under section 7.3(2)(b) measurement must be updated where a change in equipment or process affects the noise level or the duration of exposure, and on construction that is a normal occurrence rather than an exception.

Do we legally have to do a noise survey?
arrow_forward_ios

Section 7.3(1) requires you to measure noise exposure where a worker is or may be exposed to potentially harmful levels of noise, or where information indicates exposure may exceed 82 dBA Lex. Section 7.4 offers an alternative: you may skip measurement if you instead treat those workers as over-exposed and establish an effective noise control and hearing conservation program for them. Measuring is the route that tells you who is actually below the limit.

How long does a survey take?
arrow_forward_ios

Personal dosimetry is a full-shift measurement, so a survey day brackets a whole working shift — we fit dosimeters at shift start and collect them at the end. Area readings are taken in between. A single site is usually one day; an operation spread across several sites is scoped and quoted accordingly.

Who is allowed to perform noise measurement in BC?
arrow_forward_ios

The regulation sets no certification requirement for the person measuring. What it does require, under section 7.3(2), is that the measurement be carried out in accordance with CSA Standard Z107.56. The method is regulated, not the job title — which is why you should ask any provider how they sample, not just who they are.

Do we still need hearing tests if we have a survey?
arrow_forward_ios

Yes, for workers exposed above the limits. Section 7.8 requires a test within six months of starting work and at least once every 12 months after that, administered by a hearing tester authorized by the Board. The survey is what tells you which workers that applies to.

Book a Noise Survey for Your Crews

Tell us the trades, the typical tasks and the site, and we will scope the sampling. We reply within 1 business hour.

Book a workplace noise survey for construction