Clear Work coordinated and delivered an on-site hearing testing session for 20 Vertis Construction employees in Abbotsford, BC.
Step 1: Planning and Scheduling
Clear Work worked with Vertis Construction to coordinate the testing visit around their workplace requirements.
Instead of scheduling 20 separate off-site appointments, employees could be tested at the location where they were already working.
Step 2: Mobile Setup
Our mobile hearing testing unit arrived directly at the construction site with the equipment required to perform workplace audiometric testing.
The testing setup was prepared on-site so employees could move efficiently through their appointments. Step 3: Audiometric Testing
All 20 employees completed individual hearing tests using calibrated audiometric equipment.
Testing was performed by an audiometric technician and structured to keep each appointment efficient and comfortable while limiting time away from regular duties.
Step 4: Results and Documentation
Testing results were documented following each assessment.
Employees were able to receive information about their results and ask questions about the testing process, while the employer received the documentation required from the testing session.