Case Study ·
Clear Work

Hearing Testing for Thermo Design Insulation in Surrey, BC

Clear Work hearing tested 55 Thermo Design Insulation workers on-site in Surrey.

One of our Clear Work mobile hearing testing units parked at a construction site
Project Snapshot
Client
Thermo Design Insulation
Industry
Construction / Insulation
Location
Surrey, British Columbia
Service Provided
Mobile WorkSafeBC Hearing Testing
Workers Tested
55

About the Client

Thermo Design Insulation is a Surrey-based company specializing in refrigerated room construction, hygiene finishes and composite panel systems. Its crews work around noisy tools and equipment.

The Challenge
What the organization was facing

For a crew this size, individual clinic appointments would have meant a lot of scheduling and time away from the job.

Our Solution

Clear Work brought mobile hearing testing to Thermo Design Insulation in Surrey. Workers stepped into one of our mobile hearing testing units for their test and went back to work.

Records: Results were submitted to WorkSafeBC by our authorized testing team. The company received organized documentation for its hearing conservation records.

What was included:
  • On-site WorkSafeBC-compliant hearing testing.
  • One of our mobile hearing testing units.
  • Calibrated audiometric equipment.
  • Organized results and documentation.
The Results
What we delivered
Service: Workplace Hearing Testing
Testing Delivery: On-Site
Employee Travel Required: None
Billing: WorkSafeBC Construction Industry Program

Frequently Asked Questions

Can you test a construction crew on-site in Surrey?
arrow_forward_ios

Yes. We tested 55 Thermo Design Insulation workers in Surrey with one of our mobile hearing testing units.

How long does each test take?
arrow_forward_ios

About 10 minutes per worker, and each mobile unit tests 50+ workers a day.

Do construction companies pay for hearing tests?
arrow_forward_ios

Companies in WorkSafeBC classification units starting with 72 can be tested under the Construction Industry Program, so they don't pay directly for each worker tested. Thermo Design Insulation's testing was billed through the program.

How often is hearing testing required?
arrow_forward_ios

Within 6 months of a noise-exposed worker's start date, then at least once every 12 months.

Why employers across BC choose us
Mobile service delivered directly to workplaces
WorkSafeBC-authorized Industrial Audiometric Business
Calibrated audiometric testing equipment
Flexible scheduling around shifts
Organized documentation in the client portal
Service for small and large workforces

Bring occupational health testing to your workplace

Book Workplace Hearing Testing in Surrey, BC